How we work

A project with InterEdu moves through five phases: clarifying the problem, agreeing scope and success measures, phased development with something usable each cycle, testing against a realistic operating scenario, and handover with documentation and training.

Five phases

Each phase ends with something you receive, not with a meeting.

  1. 01

    Clarify the problem

    A conversation to understand the context, the users, and the constraints. You do not need a finished requirements document for this.

    You receive: A problem summary and the open questions
  2. 02

    Agree scope

    Define the first-phase scope, how success will be measured, the engagement model, and the delivery milestones.

    You receive: Scope, timeline, and contract model
  3. 03

    Phased development

    Work in cycles, each producing something runnable for you to review, rather than one delivery at the end.

    You receive: A working build each cycle
  4. 04

    Test against the real scenario

    For an assessment system, testing has to model the real session: the expected candidate count, the actual device mix, and the situations that come up.

    You receive: A test report against the agreed scenario
  5. 05

    Handover and transfer

    Source code, operating documentation, and technical documentation, with training for the receiving team and a support period.

    You receive: Source code, bilingual documentation, and training

What goes in the contract

These are agreed in writing before work starts rather than left as verbal understanding.

  • Source code and intellectual property ownership
  • Data access scope and security rules
  • How each phase will be measured
  • Termination terms and the handover plan
  • Working language and overlap hours

Start at phase one.

All you need to bring is the context. The rest of the process is agreed together.